Procurement contract F1 – Meters and defect detectors
FINALIZAT
Lot 1 – Meters:
Contract commencement date: 21.02.2011
Contract period: 6 months execution + 24 months warranty
Contract price: 1,324,100.11 RON (excl. VAT)
Contract objective: installation of 52 flow monitoring points on the water supply networks in all 7 localities. The “flow monitoring point” assembly includes civil, mechanical, electrical or automation works with the purpose of providing information mainly regarding the flow through the network.
Lot 2 – Defect detectors:
Contract commencement date: 07.01.2011
Contract period: 60 days delivery + 24 months warranty
Contract price: 145,290.00 RON (excl. VAT)
Contract objective: procurement of equipment for loss detection. Equipment operates on digital signal processing for clear identification of leakage sound, even with high level of ambient noise.
Equipment delivered:
PEUGEOT PARTNER van – mobile laboratory with systems for storing, assembling and mounting the following devices:
Acoustic leakage locator Hydrolux HL 5000 PRO;
Digital correlator for localising leakage on water pipes – Correlux P1 Standard;
Wireless noise logger for acoustic zonal monitoring and leakage location Sebalog N15 – system for locating water losses by sound recording;
Multi-frequency route locator vLocPro – for locating pipe routes and underground cables;
Ferro-magnetic locator FM880-B – for locating underground manhole covers.
Procurement contract F2 – Utility vehicles for sewerage cleaning and operational vehicles
FINALIZAT
Contract commencement date: 08.09.2010
Contract period: 210 days delivery + 60 months warranty
Contract price: 4,890,000.00 RON (excl. VAT)
Equipment delivered:
Combined auto-cleaner for sewerage – VHT Mini Combi – 4 units. Designed for cleaning sewerage pipes, settlement tanks, clearing residue from sewerage and cleaning discharge valves.
Water cleaner for sewerage – KROLL Rojet Confort – 4 units. Designed for cleaning and unblocking sewerage pipes, installed on a vehicle, built in accordance with regulations for sewerage cleaning equipment, EC, IS and TUV standards and European regulations regarding the safety and operation of equipment and noise levels.
Mobile pumps – Honda – 8 units. Pumps used for discharging waste water from sewerage pipes.
CCTV mobile system – mobile inspection laboratory CCTV Rebell – 1 unit. Utility vehicle provided with closed circuit video inspection devices and sewerage video inspection system.
Combined sewerage cleaner with water recovery system – KROLL combined cleaner Type K 0,5 – 3,5 – 8,0 / 29 with water recovery system – 1 unit. Designed for transporting non-hazardous products, built in accordance with regulations for sewerage cleaning equipment, EC, IS and TUV standards and European regulations regarding the safety and operation of equipment and noise levels.
FINALIZAT
Procurement contract F3 – extension of SCADA system
Contract commencement date: 16.01.2012
Contract period: 9 months execution
Contract price: 5,491,849.06 RON (excl. VAT)
Contract objective:
Extension of SCADA system, integration of new devices in the existing SCADA system, equipment supply, installation, putting into operation the equipment and SCADA system (development, configuration, increase number of licences and tags).